Shredder/Grinder : brighter@chinaplasmachine.com

Pipe Bending Machine:eric.hwang@wonsten.com

Search

Home > News > Content
Cleaning Of Hydraulic Oil Road For Pipe Bending Machine
May 14, 2018

Check the oil level of the fuel tank every week. The oil surface must not be lower than the oil window. For example, if the oil surface drops too fast, we should check carefully whether there is oil leakage in every part of the system.

If the oil level is too low, it should be refueling in time. The added hydraulic oil is ISO HM46 or MOBILE DTE25 or other performance hydraulic oil.

The new pipe bending machine should be changed after 250 hours. After every 2000~2500 hours, the system should be replaced with oil.


Related News